PW and WFI systems, from feed water to the last point of use.

AQCOT is a Korean engineering team specialized in purified water and water for injection for pharmaceutical and biopharmaceutical manufacturing. We maintain, troubleshoot and upgrade generation, storage and distribution systems, and help keep them qualified.

Purified water generation train of pretreatment, reverse osmosis and EDI feeding a PW tank and ambient PW loop; purified water feeds a vapor compression still that produces water for injection into a storage tank with an 80 °C hot distribution loop and points of use PW Pretreatment RO EDI Feed PW loop, ambient VCD STILL WFI T-201 CI TOC TI 80 °C
PW is generated first, then feeds the still that makes WFI. We work on both, and on every loop in between.

Two grades of water, two sets of rules.

Purified water and water for injection share equipment, people and often a plant room. They do not share limits, generation methods or the consequences of getting them wrong.

Attribute Purified water (PW) Water for injection (WFI)
Used forNon-parenteral products, equipment cleaning, feed to WFI and clean steam generatorsParenteral products, final rinse of product-contact equipment, media and buffer preparation
Typically made byPretreatment, reverse osmosis and electrodeionizationDistillation in multi-effect or vapor compression stills, or membrane systems where the pharmacopoeia allows
Stored and distributedAmbient or hot loops with periodic sanitization by heat, ozone or UVHot loops, commonly around 80 °C, or cold loops with frequent sanitization
Extra attributeNone beyond conductivity, TOC and microbial countBacterial endotoxins, with a much tighter microbial limit

The numbers we keep you inside

Every loop we look after is judged against these attributes. Values shown are USP; Ph. Eur. and KP differ on some, and we work to the monograph your site is registered under.

Water quality attributes Reference: USP
AttributePWWFI
ConductivityStage 1, at 25 °C PW≤ 1.3 µS/cm WFI≤ 1.3 µS/cm
Total organic carbon PW≤ 500 ppb WFI≤ 500 ppb
Microbial action levelGuidance in USP <1231> PW100 CFU/mL WFI10 CFU/100 mL
Bacterial endotoxins PWNot specified WFI< 0.25 EU/mL

Equipment we work on

Purified water generation

Multimedia and carbon filters, softeners, chemical dosing, single and double-pass RO, EDI and UF.

WFI generation

Multi-effect and vapor compression stills, and membrane-based WFI systems.

Storage and distribution

Tanks, vent filters, loop pumps, heat exchangers, sanitary valves, online conductivity and TOC, ozone and UV.

What we're called in for

Most water problems show up first as a number drifting on a trend or a failed sample. Finding the cause quickly is where experience counts.

Common excursions Symptom, usual causes, our response
SymptomUsual causesWhat we do
Conductivity creeping up Aging RO membranes, exhausted EDI or softener, CO₂ breakthrough Trend review, membrane and EDI performance tests, cleaning or replacement plan
TOC excursions Feed water changes, carbon bed or UV issues, contamination after maintenance Sampling across the train to locate the source, then corrective work and verification
Microbial counts at one point of use Dead legs, valve or hose issues, sampling practice Point-of-use walkdown, valve and drop inspection, targeted sanitization and resampling plan
Rouge in hot WFI loops Iron oxide build-up on stainless surfaces over years of hot operation Inspection, derouging and repassivation planned around shutdowns
Loop temperature or return flow too low Pump wear, heat exchanger fouling, demand above design Hydraulic check, component service, capacity assessment

Services

Delivered on site by engineers who commission and service PW and WFI systems in Korea.

  • Preventive maintenance

    Planned service of generation and distribution equipment, timed around production and requalification windows.

  • Troubleshooting and emergency response

    On-site diagnosis of quality excursions, alarms and equipment faults, with a clear written account of cause and fix.

  • Sanitization and passivation

    Thermal, ozone and chemical sanitization support, derouging and repassivation of stainless steel systems.

  • Spare parts

    Critical spares lists and stocking plans for membranes, EDI modules, pumps, valves, gaskets and instruments.

  • Upgrades and capacity

    Control system replacement, added generation or storage capacity, new loops and points of use.

  • Qualification support

    SAT, IQ/OQ execution support, PQ sampling plans and change control input after work on the system.

From design review to year ten

One team follows the system from its first drawings through qualification and years of operation.

  1. Design review

    Demand profile, points of use, feed water and loop hydraulics.

  2. FAT

    Factory test witness and document review before shipment.

  3. Installation and SAT

    Site supervision, commissioning and site acceptance testing.

  4. Qualification

    IQ/OQ support and PQ sampling through each phase.

  5. Operation and upgrades

    Maintenance, excursion response and capacity changes.

Talk to a water engineer

Tell us which system it is, what you are seeing and how soon you need help. An engineer will reply with next steps.

Email an engineer
Email
info@aqcot.com
Phone
+82 00 0000 0000
Office
Office address, Republic of Korea